Coast Guard publishes Notice of Temporary Deviation on New River drawbridge

Coast Guard publishes Notice of Temporary Deviation on New River drawbridge
MIAMI — The U.S. Coast Guard has authorized a temporary deviation from current regulations on the Florida East Coast Railway (FEC) Railroad Bridge across the New River, mile 2.5, at Ft. Lauderdale, Florida.  This deviation is effective from  6 a.m. on May 18, 2015 through 6 a.m. on October 16, 2015, and will operate as follows: The bridge owner, Florida East Coast Railway (FEC), will institute...